Project Detail
East Asia Solutions has given Nijhuis Industries and NXF Filtration the order to realize a plug & play packaged Direct Nano Filtration (NMS-dNF) solution to treat borehole water for the city of Davao. The unit is now being commissioned and in operation. The solution is part of a larger project to increase the fresh water availability for the city. High quality drinking water is produced in a single treatment step with specially implemented dNF membranes from NXF Filtration.
The membrane solution combines, particle removal, color removal, softening, and partial desalination. Additionally, the solution avoids the installation of a sand filter as pre-treatment and turns borehole water into drinkingwater in 1 step.
Data Plant :
- Design : 50 m3/jam
- Membrane Number : 31 unit
- Stage Number : 5 Stage
- Recovery : 85%
- Intake : Color Water Deepwell
- Start Operation : January 2020
- Sequence Operation :
- Drain 10 second with compressed air 0.4 bar
- Filtration 4 hours from top
- Drain 10 second
- Filtration Down to Top
- Drain 10 second
- And every 24 hours flush with raw water 2 minutes.